NORRIS

Substation

Florida

Max voltage
230
kV

NORRIS is an electric transmission substation in Florida. It is classified as high-voltage (230 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines5

Ownership & operation

Operator not catalogued for this substation.

StateFlorida
Coordinates28.6853, -80.9277

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#4947230 kVIN SERVICE11.3 mi
#35116230 kVIN SERVICE37.0 mi
#4188115 kVIN SERVICE19.2 mi
#18232115 kVIN SERVICE12.1 mi
#30893115 kVIN SERVICE2.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of NORRIS, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near NORRIS substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
POINSETTSubstation-AdjacentFLBrevard County500 kV1,000 MW3.6 yrs74.9
UNKNOWN120263Substation-AdjacentFLSeminole County230 kV300 MW3.6 yrs74.6
STANTONSubstation-AdjacentFLOrange County230 kV300 MW3.6 yrs74.6
CAPE CANAVERALSubstation-AdjacentFLBrevard County230 kV300 MW3.6 yrs74.0
RISER142185Substation-AdjacentFLOrange County230 kV300 MW3.6 yrs73.5
UNKNOWN122483Substation-AdjacentFLSeminole County230 kV300 MW3.6 yrs73.5
UNKNOWN108722Substation-AdjacentFLVolusia County230 kV300 MW3.6 yrs73.1
SANFORDSubstation-AdjacentFLVolusia County230 kV300 MW3.6 yrs73.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for NORRIS substation, Florida. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.