MARATHON

Substation

Florida · FLORIDA POWER & LIGHT CO

Max voltage
138
kV

MARATHON is an electric transmission substation in Florida, operated by FLORIDA POWER & LIGHT CO. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines2

Ownership & operation

OperatorFLORIDA POWER & LIGHT CO
StateFlorida
Coordinates24.7302, -81.0348

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#30351138 kVFLORIDA POWER & LIGHT COIN SERVICE18.4 mi
#47304138 kVFLORIDA POWER & LIGHT COIN SERVICE7.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MARATHON, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MARATHON substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ISLAMORADASubstation-AdjacentFLMiami-Dade County138 kV100 MW3.6 yrs59.2
MARATHONSubstation-AdjacentFLMonroe County138 kV100 MW3.6 yrs57.9
UNKNOWN108501Substation-AdjacentFLMonroe County138 kV100 MW3.6 yrs57.3
MARATHON GENERATING PLANTSubstation-AdjacentFLMonroe County138 kV100 MW3.6 yrs56.2
Marathon Generating PlantBrownfieldFLMonroe14 MW54.9
UNKNOWN120079Substation-AdjacentFLMonroe County138 kV100 MW3.6 yrs54.8
Greenfield (TAP141792 - ISLAMORADA)GreenfieldFLMonroe County138 kV100 MW3.6 yrs53.4
Greenfield (TAP141792 - ISLAMORADA)GreenfieldFLMonroe County138 kV100 MW3.6 yrs52.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for MARATHON substation, Florida. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.