INGLIS

Substation

Florida · DUKE ENERGY FLORIDA, LLC

Max voltage
115
kV

INGLIS is an electric transmission substation in Florida, operated by DUKE ENERGY FLORIDA, LLC. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorDUKE ENERGY FLORIDA, LLC
StateFlorida
Coordinates28.9950, -82.6445

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#41128115 kVDUKE ENERGY FLORIDA, LLCIN SERVICE6.7 mi
#42399115 kVDUKE ENERGY FLORIDA, LLCIN SERVICE6.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of INGLIS, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near INGLIS substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BROOKRIDGESubstation-AdjacentFLHernando County500 kV1,000 MW3.6 yrs75.5
CRYSTAL RIVERSubstation-AdjacentFLCitrus County500 kV1,000 MW3.6 yrs68.3
Greenfield (CRYSTAL RIVER - CENTRAL FLORID)GreenfieldFLCitrus County500 kV1,000 MW3.6 yrs67.6
TAP155704Substation-AdjacentFLCitrus County230 kV300 MW3.6 yrs67.2
TWIN COUNTY RANCHSubstation-AdjacentFLHernando County115 kV100 MW3.6 yrs67.0
CRYSTAL RIVER EASTSubstation-AdjacentFLCitrus County230 kV300 MW3.6 yrs66.9
Greenfield (BROOKRIDGE - CRYSTAL RIVER)GreenfieldFLHernando County500 kV1,000 MW3.6 yrs66.0
Greenfield (BROOKRIDGE - UNKNOWN156846)GreenfieldFLHernando County230 kV300 MW3.6 yrs64.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.