INDIAN RIVER PLANT

Substation

Florida

Max voltage
230
kV

INDIAN RIVER PLANT is an electric transmission substation in Florida. It is classified as high-voltage (230 kv) and connects 8 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines8

Ownership & operation

Operator not catalogued for this substation.

StateFlorida
Coordinates28.4930, -80.8754

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#6684230 kVIN SERVICE23.9 mi
#22312230 kVIN SERVICE2.7 mi
#24552230 kVIN SERVICE23.9 mi
#31311230 kVIN SERVICE2.7 mi
#64218230 kV0.1 mi
#41956115 kVIN SERVICE23.8 mi
#24955115 kVIN SERVICE23.8 mi
#64220115 kVIN SERVICE0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of INDIAN RIVER PLANT, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near INDIAN RIVER PLANT substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
POINSETTSubstation-AdjacentFLBrevard County500 kV1,000 MW3.6 yrs74.9
STANTONSubstation-AdjacentFLOrange County230 kV300 MW3.6 yrs74.6
CAPE CANAVERALSubstation-AdjacentFLBrevard County230 kV300 MW3.6 yrs74.0
MALABARSubstation-AdjacentFLBrevard County230 kV300 MW3.6 yrs73.2
UNKNOWN120264Substation-AdjacentFLSeminole County230 kV300 MW3.6 yrs72.5
SUNTREESubstation-AdjacentFLBrevard County138 kV100 MW3.6 yrs71.4
OSTEENSubstation-AdjacentFLSeminole County230 kV300 MW3.6 yrs71.4
FRONTENACSubstation-AdjacentFLBrevard County115 kV100 MW3.6 yrs71.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for INDIAN RIVER PLANT substation, Florida. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.