HOLDER

Substation

Florida · DUKE ENERGY FLORIDA, INC

Max voltage
230
kV

HOLDER is an electric transmission substation in Florida, operated by DUKE ENERGY FLORIDA, INC. It is classified as high-voltage (230 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines5

Ownership & operation

OperatorDUKE ENERGY FLORIDA, INC
Co-ownerDUKE ENERGY FLORIDA, LLC
StateFlorida
Coordinates28.9712, -82.5039

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#23129230 kVDUKE ENERGY FLORIDA, LLCIN SERVICE11.4 mi
#24290230 kVDUKE ENERGY FLORIDA, INCIN SERVICE16.8 mi
#43681230 kVDUKE ENERGY FLORIDA, LLCIN SERVICE11.3 mi
#50499230 kVDUKE ENERGY FLORIDA, INCIN SERVICE16.9 mi
#22038115 kVDUKE ENERGY FLORIDA, LLCIN SERVICE3.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of HOLDER, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near HOLDER substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BROOKRIDGESubstation-AdjacentFLHernando County500 kV1,000 MW3.6 yrs75.5
CRYSTAL RIVERSubstation-AdjacentFLCitrus County500 kV1,000 MW3.6 yrs68.3
Greenfield (CRYSTAL RIVER - CENTRAL FLORID)GreenfieldFLCitrus County500 kV1,000 MW3.6 yrs67.6
ANDERSONSubstation-AdjacentFLSumter County230 kV300 MW3.6 yrs67.3
TAP155704Substation-AdjacentFLCitrus County230 kV300 MW3.6 yrs67.2
TWIN COUNTY RANCHSubstation-AdjacentFLHernando County115 kV100 MW3.6 yrs67.0
CRYSTAL RIVER EASTSubstation-AdjacentFLCitrus County230 kV300 MW3.6 yrs66.9
Greenfield (BROOKRIDGE - CRYSTAL RIVER)GreenfieldFLHernando County500 kV1,000 MW3.6 yrs66.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for HOLDER substation, Florida. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.