HOBE

Substation

Florida · FLORIDA POWER & LIGHT CO

Max voltage
230
kV

HOBE is an electric transmission substation in Florida, operated by FLORIDA POWER & LIGHT CO. It is classified as high-voltage (230 kv) and connects 6 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage138 kV
Voltage classHigh-voltage (230 kV)
Connected lines6

Ownership & operation

OperatorFLORIDA POWER & LIGHT CO
StateFlorida
Coordinates27.0547, -80.1654

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#3840230 kVFLORIDA POWER & LIGHT COIN SERVICE6.1 mi
#189138 kVFLORIDA POWER & LIGHT COIN SERVICE10.0 mi
#6378138 kVFLORIDA POWER & LIGHT COIN SERVICE7.2 mi
#24839138 kVFLORIDA POWER & LIGHT COIN SERVICE9.1 mi
#26018138 kVFLORIDA POWER & LIGHT COIN SERVICE8.4 mi
#36681138 kVFLORIDA POWER & LIGHT COIN SERVICE0.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of HOBE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near HOBE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MIDWAYSubstation-AdjacentFLSt. Lucie County500 kV1,000 MW3.6 yrs75.1
RIVIERASubstation-AdjacentFLPalm Beach County230 kV300 MW3.6 yrs74.0
RANCHSubstation-AdjacentFLPalm Beach County230 kV300 MW3.6 yrs72.7
UNKNOWN120605Substation-AdjacentFLPalm Beach County230 kV300 MW3.6 yrs72.3
ALEXANDERSubstation-AdjacentFLMartin County230 kV300 MW3.6 yrs71.3
RALLSSubstation-AdjacentFLSt. Lucie County230 kV300 MW3.6 yrs70.9
TESOROSubstation-AdjacentFLMartin County230 kV300 MW3.6 yrs70.9
UNKNOWN150694Substation-AdjacentFLSt. Lucie County230 kV300 MW3.6 yrs70.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for HOBE substation, Florida. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.