FORT WHITE

Substation

Florida · DUKE ENERGY FLORIDA, LLC

Max voltage
230
kV

FORT WHITE is an electric transmission substation in Florida, operated by DUKE ENERGY FLORIDA, LLC. It is classified as high-voltage (230 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines4

Ownership & operation

OperatorDUKE ENERGY FLORIDA, LLC
StateFlorida
Coordinates29.9704, -82.8406

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#6487230 kVDUKE ENERGY FLORIDA, LLCIN SERVICE23.3 mi
#42565230 kVDUKE ENERGY FLORIDA, LLCIN SERVICE12.0 mi
#31835115 kVDUKE ENERGY FLORIDA, LLCIN SERVICE28.2 mi
#61953115 kVIN SERVICE6.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of FORT WHITE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near FORT WHITE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
NEWBERRYSubstation-AdjacentFLGilchrist County230 kV300 MW3.6 yrs73.2
WILCOXSubstation-AdjacentFLGilchrist County230 kV300 MW3.6 yrs71.7
UNKNOWN120453Substation-AdjacentFLGilchrist County230 kV300 MW3.6 yrs70.9
FORT WHITESubstation-AdjacentFLSuwannee County230 kV300 MW5.8 yrs70.0
UNKNOWN120457Substation-AdjacentFLGilchrist County230 kV300 MW3.6 yrs69.2
PARKERSubstation-AdjacentFLAlachua County230 kV300 MW3.6 yrs69.1
UNKNOWN107674Substation-AdjacentFLSuwannee County230 kV300 MW5.8 yrs68.8
UNKNOWN108267Substation-AdjacentFLColumbia County115 kV100 MW3.6 yrs68.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for FORT WHITE substation, Florida. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.