DESOTO COUNTY PLANT

Substation

Florida · FLORIDA POWER & LIGHT CO

Max voltage
230
kV

DESOTO COUNTY PLANT is an electric transmission substation in Florida, operated by FLORIDA POWER & LIGHT CO. It is classified as high-voltage (230 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines2

Ownership & operation

OperatorFLORIDA POWER & LIGHT CO
StateFlorida
Coordinates27.2254, -81.8092

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#5614230 kVFLORIDA POWER & LIGHT CO0.1 mi
#21712230 kVFLORIDA POWER & LIGHT COIN SERVICE0.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of DESOTO COUNTY PLANT, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near DESOTO COUNTY PLANT substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
DESOTO COUNTY PLANTSubstation-AdjacentFLDeSoto County230 kV300 MW3.6 yrs70.9
DESOTO NEXT GENERATION SOLAR ENERGYSubstation-AdjacentFLDeSoto County230 kV300 MW3.6 yrs70.7
WHIDDENSubstation-AdjacentFLDeSoto County230 kV300 MW3.6 yrs70.2
KEENTOWNSubstation-AdjacentFLManatee County230 kV300 MW3.6 yrs69.3
VANDOLAH POWER STATIONSubstation-AdjacentFLHardee County230 kV300 MW3.6 yrs68.8
UNKNOWN108485Substation-AdjacentFLDeSoto County230 kV300 MW3.6 yrs68.7
DEEPCREEKSubstation-AdjacentFLCharlotte County230 kV300 MW3.6 yrs67.1
FISHEATING CREEKSubstation-AdjacentFLHighlands County230 kV300 MW3.6 yrs66.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.