DEADEND167089

Substation

Florida

Max voltage
230
kV

DEADEND167089 is an electric transmission substation in Florida. It is classified as high-voltage (230 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines1

Ownership & operation

Operator not catalogued for this substation.

StateFlorida
Coordinates27.7972, -82.3957

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#51036230 kVIN SERVICE2.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of DEADEND167089, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near DEADEND167089 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
LAKE TARPONSubstation-AdjacentFLPasco County500 kV1,000 MW3.6 yrs79.2
DEADEND167089Substation-AdjacentFLHillsborough County230 kV300 MW3.6 yrs76.6
JUNEAUSubstation-AdjacentFLHillsborough County230 kV300 MW3.6 yrs76.4
TAP142090Substation-AdjacentFLHillsborough County230 kV300 MW3.6 yrs74.8
ANCLOTESubstation-AdjacentFLPinellas County230 kV300 MW3.6 yrs73.9
UNKNOWN120308Substation-AdjacentFLPinellas County230 kV300 MW3.6 yrs73.9
UNKNOWN120342Substation-AdjacentFLPinellas County230 kV300 MW3.6 yrs73.3
TAP151120Substation-AdjacentFLHillsborough County138 kV100 MW3.6 yrs73.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for DEADEND167089 substation, Florida. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.