COCOA

Substation

Florida · FLORIDA POWER & LIGHT CO

Max voltage
138
kV

COCOA is an electric transmission substation in Florida, operated by FLORIDA POWER & LIGHT CO. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorFLORIDA POWER & LIGHT CO
StateFlorida
Coordinates28.3528, -80.7274

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#3371138 kVIN SERVICE1.9 mi
#31303138 kVFLORIDA POWER & LIGHT COIN SERVICE1.8 mi
#39161138 kVIN SERVICE6.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of COCOA, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near COCOA substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
POINSETTSubstation-AdjacentFLBrevard County500 kV1,000 MW3.6 yrs74.9
CAPE CANAVERALSubstation-AdjacentFLBrevard County230 kV300 MW3.6 yrs74.0
MALABARSubstation-AdjacentFLBrevard County230 kV300 MW3.6 yrs73.2
UNKNOWN124319Substation-AdjacentFLBrevard County230 kV300 MW3.6 yrs72.5
SARNOSubstation-AdjacentFLBrevard County230 kV300 MW3.6 yrs71.6
SUNTREESubstation-AdjacentFLBrevard County138 kV100 MW3.6 yrs71.4
FRONTENACSubstation-AdjacentFLBrevard County115 kV100 MW3.6 yrs71.2
VIERASubstation-AdjacentFLBrevard County230 kV300 MW3.6 yrs70.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen