ALICO

Substation

Florida · FLORIDA POWER & LIGHT CO

Max voltage
230
kV

ALICO is an electric transmission substation in Florida, operated by FLORIDA POWER & LIGHT CO. It is classified as high-voltage (230 kv) and connects 7 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage138 kV
Voltage classHigh-voltage (230 kV)
Connected lines7

Ownership & operation

OperatorFLORIDA POWER & LIGHT CO
StateFlorida
Coordinates26.4404, -81.8096

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#42448230 kVFLORIDA POWER & LIGHT COIN SERVICE0.2 mi
#46499230 kVFLORIDA POWER & LIGHT COIN SERVICE14.9 mi
#46812230 kVFLORIDA POWER & LIGHT COIN SERVICE17.1 mi
#12250138 kVFLORIDA POWER & LIGHT COIN SERVICE19.1 mi
#48176138 kVFLORIDA POWER & LIGHT COIN SERVICE4.9 mi
#33959138 kVFLORIDA POWER & LIGHT COIN SERVICE14.8 mi
#36715138 kVFLORIDA POWER & LIGHT COIN SERVICE4.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of ALICO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near ALICO substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ORANGE RIVERSubstation-AdjacentFLLee County500 kV1,000 MW3.6 yrs72.5
LIVINGSTONSubstation-AdjacentFLCollier County230 kV300 MW3.6 yrs72.3
ALICOSubstation-AdjacentFLLee County230 kV300 MW3.6 yrs72.0
TERRYSubstation-AdjacentFLLee County230 kV300 MW3.6 yrs71.7
BUCKINGHAMSubstation-AdjacentFLLee County230 kV300 MW3.6 yrs71.6
JETPORTSubstation-AdjacentFLLee County230 kV300 MW3.6 yrs71.3
TAP141795Substation-AdjacentFLLee County230 kV300 MW3.6 yrs71.1
TAP152014Substation-AdjacentFLLee County230 kV300 MW3.6 yrs70.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ALICO substation, Florida. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.