TERRY

Substation

Colorado · WAPA-- WESTERN AREA POWER ADMINISTRATION

Max voltage
115
kV

TERRY is an electric transmission substation in Colorado, operated by WAPA-- WESTERN AREA POWER ADMINISTRATION. It is classified as sub-transmission (115 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines4

Ownership & operation

OperatorWAPA-- WESTERN AREA POWER ADMINISTRATION
Coordinates40.1609, -105.1044

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#68926115 kVWAPA-- WESTERN AREA POWER ADMINISTRATION3.2 mi
#69112115 kVWAPA-- WESTERN AREA POWER ADMINISTRATION2.1 mi
#69122115 kVWAPA-- WESTERN AREA POWER ADMINISTRATION15.8 mi
#72343115 kVWAPA-- WESTERN AREA POWER ADMINISTRATION2.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TERRY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TERRY substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CHEROKEESubstation-AdjacentCODenver County230 kV300 MW1.7 yrs75.1
CHAMBERSSubstation-AdjacentCODenver County230 kV300 MW1.7 yrs72.5
REUNIONSubstation-AdjacentCODenver County230 kV300 MW1.7 yrs70.9
UNKNOWN201488Substation-AdjacentCOBroomfield County230 kV300 MW1.7 yrs70.4
ARVADASubstation-AdjacentCODenver County230 kV300 MW1.7 yrs70.1
RUSSELLSubstation-AdjacentCODenver County230 kV300 MW1.7 yrs70.1
ValmontBrownfieldCOBroomfield192 MW69.7
RIVERDALESubstation-AdjacentCODenver County230 kV300 MW1.7 yrs69.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TERRY substation, Colorado. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.