TAP208107
SubstationColorado · SOUTHEAST COLORADO POWER ASSN
TAP208107 is an electric transmission substation in Colorado, operated by SOUTHEAST COLORADO POWER ASSN. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #78796 | 115 kV | SOUTHEAST COLORADO POWER ASSN | — | 4.1 mi |
| #78797 | 115 kV | SOUTHEAST COLORADO POWER ASSN | — | 5.0 mi |
| #78798 | 115 kV | SOUTHEAST COLORADO POWER ASSN | — | 5.7 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP208107, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| LAMAR HVDC TIE | Substation-Adjacent | CO | Kiowa County | 345 kV | 600 MW | 1.7 yrs | 66.1 |
| COLORADO GREEN | Substation-Adjacent | CO | Prowers County | 230 kV | 300 MW | 1.7 yrs | 62.6 |
| COLORADO GREEN HOLDINGS LLC | Substation-Adjacent | CO | Prowers County | 230 kV | 300 MW | 1.7 yrs | 62.5 |
| UNKNOWN208108 | Substation-Adjacent | CO | Kiowa County | 115 kV | 100 MW | 1.7 yrs | 61.2 |
| UNKNOWN208110 | Substation-Adjacent | CO | Prowers County | 115 kV | 100 MW | 1.7 yrs | 58.8 |
| Greenfield (BOONE - LAMAR HVDC TIE) | Greenfield | CO | Kiowa County | 230 kV | 300 MW | 1.7 yrs | 58.5 |
| TAP208106 | Substation-Adjacent | CO | Prowers County | 115 kV | 100 MW | 1.7 yrs | 58.2 |
| TAP206905 | Substation-Adjacent | CO | Prowers County | 115 kV | 100 MW | 1.7 yrs | 58.1 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP208107 substation, Colorado. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.