TAP208099

Substation

Colorado · BLACK HILLS/COLORADO ELEC.UTIL

Max voltage
115
kV

TAP208099 is an electric transmission substation in Colorado, operated by BLACK HILLS/COLORADO ELEC.UTIL. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorBLACK HILLS/COLORADO ELEC.UTIL
Coordinates38.1094, -103.8666

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#78785115 kVBLACK HILLS/COLORADO ELEC.UTIL0.2 mi
#78786115 kVBLACK HILLS/COLORADO ELEC.UTIL12.5 mi
#78787115 kVBLACK HILLS/COLORADO ELEC.UTIL8.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP208099, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP208099 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BOONESubstation-AdjacentCOPueblo County230 kV300 MW1.7 yrs64.7
TAP205671Substation-AdjacentCOPueblo County138 kV100 MW1.7 yrs61.5
UNKNOWN203931Substation-AdjacentCOOtero County115 kV100 MW1.7 yrs60.8
TAP206901Substation-AdjacentCOPueblo County138 kV100 MW1.7 yrs60.3
TAP208102Substation-AdjacentCOOtero County115 kV100 MW1.7 yrs59.9
Greenfield (BOONE - MIDWAY)GreenfieldCOPueblo County230 kV300 MW1.7 yrs59.4
MANZANOLASubstation-AdjacentCOCrowley County115 kV100 MW1.7 yrs57.3
ORDWAYSubstation-AdjacentCOCrowley County115 kV100 MW1.7 yrs56.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.