TAP208071

Substation

Colorado · SAN ISABEL ELECTRIC ASSN, INC

Max voltage
115
kV

TAP208071 is an electric transmission substation in Colorado, operated by SAN ISABEL ELECTRIC ASSN, INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorSAN ISABEL ELECTRIC ASSN, INC
Coordinates37.9428, -104.8294

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#78757115 kVSAN ISABEL ELECTRIC ASSN, INC6.4 mi
#78758115 kVSAN ISABEL ELECTRIC ASSN, INC13.2 mi
#78759115 kVSAN ISABEL ELECTRIC ASSN, INC14.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP208071, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP208071 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
COMANCHESubstation-AdjacentCOPueblo County345 kV600 MW1.7 yrs73.7
PUEBLOSubstation-AdjacentCOPueblo County230 kV300 MW1.7 yrs69.1
Pueblo Airport Generating StationBrownfieldCOPueblo100 MW66.5
PUEBLO AIRPORT GENERATING STATIONSubstation-AdjacentCOPueblo County115 kV100 MW1.7 yrs65.9
WALSENBURGSubstation-AdjacentCOHuerfano County230 kV300 MW1.7 yrs64.9
UNKNOWN208082Substation-AdjacentCOPueblo County138 kV100 MW1.7 yrs63.9
UNKNOWN203927Substation-AdjacentCOPueblo County138 kV100 MW1.7 yrs63.7
Greenfield (WALSENBURG - GLADSTONE)GreenfieldCOHuerfano County230 kV300 MW3.4 yrs63.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP208071 substation, Colorado. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.