TAP208063

Substation

Colorado · LA PLATA ELECTRIC ASSN, INC

Max voltage
115
kV

TAP208063 is an electric transmission substation in Colorado, operated by LA PLATA ELECTRIC ASSN, INC. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorLA PLATA ELECTRIC ASSN, INC
Coordinates37.2812, -107.8656

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#78749115 kVLA PLATA ELECTRIC ASSN, INC0.9 mi
#78750115 kVLA PLATA ELECTRIC ASSN, INC0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP208063, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP208063 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
HESPERUSSubstation-AdjacentCOLa Plata County345 kV600 MW1.7 yrs65.9
UNKNOWN203901Substation-AdjacentCOLa Plata County115 kV100 MW1.7 yrs60.6
UNKNOWN202564Substation-AdjacentCOLa Plata County115 kV100 MW1.7 yrs60.5
TAP208063Substation-AdjacentCOLa Plata County115 kV100 MW1.7 yrs60.1
HART CANYONSubstation-AdjacentCOLa Plata County115 kV100 MW3.5 yrs60.1
UNKNOWN204023Substation-AdjacentCOLa Plata County115 kV100 MW1.7 yrs60.0
UNKNOWN205932Substation-AdjacentCOLa Plata County115 kV100 MW1.7 yrs60.0
UNKNOWN202552Substation-AdjacentCOLa Plata County115 kV100 MW1.7 yrs59.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen