TAP208053

Substation

Colorado · TRI-STATE G & T ASSN, INC

Max voltage
115
kV

TAP208053 is an electric transmission substation in Colorado, operated by TRI-STATE G & T ASSN, INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorTRI-STATE G & T ASSN, INC
Coordinates37.5180, -108.6872

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#76296115 kVTRI-STATE G & T ASSN, INC3.0 mi
#76297115 kVTRI-STATE G & T ASSN, INC3.0 mi
#76298115 kVTRI-STATE G & T ASSN, INC11.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP208053, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP208053 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
LOST CANYONSubstation-AdjacentCOMontezuma County230 kV300 MW3.5 yrs65.1
Greenfield (PINTO - FOUR CORNERS)GreenfieldCOMontezuma County345 kV600 MW3.5 yrs60.5
Greenfield (PINTO - FOUR CORNERS)GreenfieldCOMontezuma County345 kV600 MW3.5 yrs60.1
Greenfield (PINTO - FOUR CORNERS)GreenfieldCOMontezuma County345 kV600 MW3.5 yrs60.0
UNKNOWN206139Substation-AdjacentCOMontezuma County115 kV100 MW1.7 yrs59.0
MANCOSSubstation-AdjacentCOMontezuma County115 kV100 MW1.7 yrs58.9
UNKNOWN208050Substation-AdjacentCOMontezuma County115 kV100 MW1.7 yrs58.6
UNKNOWN201499Substation-AdjacentCOMontezuma County115 kV100 MW1.7 yrs58.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP208053 substation, Colorado. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.