TAP206131 is an electric transmission substation in Colorado, operated by Y-W ELECTRIC ASSN INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorY-W ELECTRIC ASSN INC
Coordinates39.7026, -102.7077

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#71773115 kVY-W ELECTRIC ASSN INC13.1 mi
#74240115 kVY-W ELECTRIC ASSN INC6.9 mi
#74464115 kVY-W ELECTRIC ASSN INC2.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP206131, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP206131 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
LANDSMAN CREEKSubstation-AdjacentCOKit Carson County230 kV300 MW1.7 yrs64.7
UNKNOWN205864Substation-AdjacentCOYuma County115 kV100 MW1.7 yrs62.0
JOESSubstation-AdjacentCOKit Carson County115 kV100 MW1.7 yrs61.6
UNKNOWN205865Substation-AdjacentCOYuma County115 kV100 MW1.7 yrs60.8
UNKNOWN206130Substation-AdjacentCOYuma County115 kV100 MW1.7 yrs60.3
LIBERTYSubstation-AdjacentCOKit Carson County115 kV100 MW1.7 yrs60.2
UNKNOWN205862Substation-AdjacentCOYuma County115 kV100 MW1.7 yrs60.2
HELL CREEKSubstation-AdjacentCOKit Carson County115 kV100 MW1.7 yrs59.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP206131 substation, Colorado. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.