TAP205926

Substation

Colorado · LA PLATA ELECTRIC ASSN, INC

Max voltage
115
kV

TAP205926 is an electric transmission substation in Colorado, operated by LA PLATA ELECTRIC ASSN, INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorLA PLATA ELECTRIC ASSN, INC
Co-ownerTRI-STATE G & T ASSN, INC
Coordinates37.6213, -107.8124

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#68807115 kVTRI-STATE G & T ASSN, INC9.8 mi
#71934115 kVLA PLATA ELECTRIC ASSN, INC1.1 mi
#71935115 kVLA PLATA ELECTRIC ASSN, INC0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP205926, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP205926 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BURRO BRIDGESubstation-AdjacentCOSan Juan County138 kV100 MW1.7 yrs62.6
TAP203985Substation-AdjacentCOSan Juan County115 kV100 MW1.7 yrs62.5
UNKNOWN205925Substation-AdjacentCOSan Juan County115 kV100 MW1.7 yrs61.1
UNKNOWN202564Substation-AdjacentCOLa Plata County115 kV100 MW1.7 yrs60.5
TAP208063Substation-AdjacentCOLa Plata County115 kV100 MW1.7 yrs60.1
UNKNOWN203759Substation-AdjacentCOSan Juan County115 kV100 MW1.7 yrs60.0
SILVERTONSubstation-AdjacentCOSan Juan County115 kV100 MW1.7 yrs59.9
UNKNOWN202552Substation-AdjacentCOLa Plata County115 kV100 MW1.7 yrs59.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP205926 substation, Colorado. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.