TAP205898

Substation

Colorado · PLATTE RIVER POWER AUTHORITY

Max voltage
230
kV

TAP205898 is an electric transmission substation in Colorado, operated by PLATTE RIVER POWER AUTHORITY. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorPLATTE RIVER POWER AUTHORITY
Coordinates40.6004, -105.1020

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#72287230 kVPLATTE RIVER POWER AUTHORITY26.1 mi
#72302230 kVPLATTE RIVER POWER AUTHORITY5.7 mi
#72346230 kVPLATTE RIVER POWER AUTHORITY2.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP205898, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP205898 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN203998Substation-AdjacentWYLaramie County230 kV300 MW1.7 yrs71.2
PONNEQUINSubstation-AdjacentWYLaramie County115 kV100 MW1.7 yrs67.8
RAWHIDESubstation-AdjacentCOLarimer County230 kV300 MW1.7 yrs67.7
AULTSubstation-AdjacentCOWeld County345 kV600 MW1.7 yrs67.5
HARMONYSubstation-AdjacentCOLarimer County230 kV300 MW1.7 yrs67.4
PORTNERSubstation-AdjacentCOLarimer County230 kV300 MW1.7 yrs66.9
PONNEQUIN PHASE 1Substation-AdjacentWYLaramie County115 kV100 MW1.7 yrs66.8
FORT ST VRAINSubstation-AdjacentCOBroomfield County230 kV300 MW1.7 yrs66.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP205898 substation, Colorado. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.