TAP205875

Substation

Colorado · HIGHLINE ELECTRIC ASSN

Max voltage
115
kV

TAP205875 is an electric transmission substation in Colorado, operated by HIGHLINE ELECTRIC ASSN. It is classified as sub-transmission (115 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines4

Ownership & operation

OperatorHIGHLINE ELECTRIC ASSN
Coordinates40.9328, -102.4589

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#71860115 kVHIGHLINE ELECTRIC ASSN19.5 mi
#71864115 kVHIGHLINE ELECTRIC ASSN9.8 mi
#71865115 kVHIGHLINE ELECTRIC ASSN10.7 mi
#71866115 kVHIGHLINE ELECTRIC ASSN1.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP205875, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP205875 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN202159Substation-AdjacentNECheyenne County230 kV300 MW3.5 yrs67.0
UNKNOWN202177Substation-AdjacentNEDeuel County345 kV600 MW3.5 yrs66.9
UNKNOWN162767Substation-AdjacentNEDeuel County115 kV100 MW3.5 yrs63.5
Greenfield (KEYSTONE - UNKNOWN202177)GreenfieldNEDeuel County345 kV600 MW3.5 yrs63.2
Greenfield (KEYSTONE - UNKNOWN202177)GreenfieldNEDeuel County345 kV600 MW3.5 yrs63.2
Greenfield (KEYSTONE - UNKNOWN202177)GreenfieldNECheyenne County345 kV600 MW3.5 yrs63.0
UNKNOWN205889Substation-AdjacentCOPhillips County115 kV100 MW1.7 yrs62.8
TAP205885Substation-AdjacentNEDeuel County115 kV100 MW3.5 yrs62.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP205875 substation, Colorado. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.