TAP205856 is an electric transmission substation in Colorado, operated by CITY OF FORT MORGAN. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorCITY OF FORT MORGAN
Coordinates40.2490, -103.7684

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#71841115 kVCITY OF FORT MORGAN0.9 mi
#71842115 kVCITY OF FORT MORGAN0.0 mi
#71843115 kVCITY OF FORT MORGAN0.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP205856, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP205856 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
PAWNEESubstation-AdjacentCOMorgan County345 kV600 MW1.7 yrs68.8
TAP206216Substation-AdjacentCOMorgan County230 kV300 MW1.7 yrs66.1
TAP206215Substation-AdjacentCOMorgan County230 kV300 MW1.7 yrs65.9
STORY 345KVSubstation-AdjacentCOMorgan County345 kV600 MW1.7 yrs65.6
UNKNOWN206341Substation-AdjacentCOMorgan County115 kV100 MW1.7 yrs63.4
UNKNOWN205850Substation-AdjacentCOMorgan County115 kV100 MW1.7 yrs63.2
Greenfield (LARAMIE RIVER - STORY 345KV)GreenfieldCOMorgan County345 kV600 MW1.7 yrs62.9
TAP205856Substation-AdjacentCOMorgan County115 kV100 MW1.7 yrs62.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP205856 substation, Colorado. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.