TAP205667
SubstationColorado · SOUTHEAST COLORADO POWER ASSN
TAP205667 is an electric transmission substation in Colorado, operated by SOUTHEAST COLORADO POWER ASSN. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #68867 | 230 kV | TRI-STATE G & T ASSN, INC | — | 43.9 mi |
| #72177 | 230 kV | SOUTHEAST COLORADO POWER ASSN | — | 0.0 mi |
| #72178 | 230 kV | SOUTHEAST COLORADO POWER ASSN | — | 0.1 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP205667, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| COLORADO GREEN | Substation-Adjacent | CO | Prowers County | 230 kV | 300 MW | 1.7 yrs | 62.6 |
| COLORADO GREEN HOLDINGS LLC | Substation-Adjacent | CO | Prowers County | 230 kV | 300 MW | 1.7 yrs | 62.5 |
| UNKNOWN201396 | Substation-Adjacent | CO | Bent County | 230 kV | 300 MW | 1.7 yrs | 61.8 |
| UNKNOWN208108 | Substation-Adjacent | CO | Kiowa County | 115 kV | 100 MW | 1.7 yrs | 61.2 |
| UNKNOWN208110 | Substation-Adjacent | CO | Prowers County | 115 kV | 100 MW | 1.7 yrs | 58.8 |
| TAP208106 | Substation-Adjacent | CO | Prowers County | 115 kV | 100 MW | 1.7 yrs | 58.2 |
| TAP208107 | Substation-Adjacent | CO | Prowers County | 115 kV | 100 MW | 1.7 yrs | 58.1 |
| TAP206905 | Substation-Adjacent | CO | Prowers County | 115 kV | 100 MW | 1.7 yrs | 58.1 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP205667 substation, Colorado. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.