TAP205175

Substation

Colorado · NORTHERN WASCO COUNTY PUD

Max voltage
115
kV

TAP205175 is an electric transmission substation in Colorado, operated by NORTHERN WASCO COUNTY PUD. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorNORTHERN WASCO COUNTY PUD
Co-ownerYAMPA VALLEY ELECTRIC ASSN INC
Coordinates40.3792, -107.1157

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#71946115 kVYAMPA VALLEY ELECTRIC ASSN INC0.4 mi
#71947115 kVYAMPA VALLEY ELECTRIC ASSN INC3.7 mi
#77438115 kVNORTHERN WASCO COUNTY PUDIN SERVICE0.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP205175, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP205175 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MT. HARRISSubstation-AdjacentCORoutt County230 kV300 MW1.7 yrs64.6
STEAMBOATSubstation-AdjacentCORoutt County230 kV300 MW1.7 yrs63.9
UNKNOWN202355Substation-AdjacentCORoutt County230 kV300 MW1.7 yrs62.5
UNKNOWN203889Substation-AdjacentCORoutt County115 kV100 MW1.7 yrs60.8
TAP205167Substation-AdjacentCORoutt County138 kV100 MW1.7 yrs59.6
Greenfield (CRAIG - AULT)GreenfieldCORoutt County345 kV600 MW1.7 yrs59.1
TAP209559Substation-AdjacentCORoutt County115 kV100 MW1.7 yrs58.9
UNKNOWN202246Substation-AdjacentCORoutt County115 kV100 MW1.7 yrs58.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.