TAP205159 is an electric transmission substation in Colorado, operated by INTERMOUNTAIN RURAL ELEC ASSN. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorINTERMOUNTAIN RURAL ELEC ASSN
Co-ownerPUBLIC SERVICE CO OF COLORADO
Coordinates39.3731, -104.8261

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#71808115 kVINTERMOUNTAIN RURAL ELEC ASSN0.0 mi
#71811115 kVINTERMOUNTAIN RURAL ELEC ASSN1.2 mi
#72167115 kVPUBLIC SERVICE CO OF COLORADO14.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP205159, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP205159 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CHAMBERSSubstation-AdjacentCODenver County230 kV300 MW1.7 yrs72.5
LACOMBESubstation-AdjacentCODenver County230 kV300 MW1.7 yrs72.0
JEWELLSubstation-AdjacentCODenver County230 kV300 MW1.7 yrs71.9
ORACHARDSubstation-AdjacentCODenver County230 kV300 MW1.7 yrs71.9
ELATISubstation-AdjacentCODenver County230 kV300 MW1.7 yrs71.8
SPRUCESubstation-AdjacentCODenver County230 kV300 MW1.7 yrs71.7
DAKOTASubstation-AdjacentCODenver County230 kV300 MW1.7 yrs71.5
DANIELS PARKSubstation-AdjacentCODouglas County345 kV600 MW1.7 yrs71.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP205159 substation, Colorado. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.