TAP204067

Substation

Colorado · PUBLIC SERVICE CO OF COLORADO

Max voltage
230
kV

TAP204067 is an electric transmission substation in Colorado, operated by PUBLIC SERVICE CO OF COLORADO. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorPUBLIC SERVICE CO OF COLORADO
Co-ownerWAPA-- WESTERN AREA POWER ADMINISTRATION
Coordinates40.1082, -104.5501

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#69104230 kVPUBLIC SERVICE CO OF COLORADO0.2 mi
#69105230 kVPUBLIC SERVICE CO OF COLORADO0.0 mi
#69106230 kVWAPA-- WESTERN AREA POWER ADMINISTRATION76.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP204067, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP204067 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CHAMBERSSubstation-AdjacentCODenver County230 kV300 MW1.7 yrs72.5
SPRUCESubstation-AdjacentCODenver County230 kV300 MW1.7 yrs71.7
MONROESubstation-AdjacentCODenver County230 kV300 MW1.7 yrs71.4
REUNIONSubstation-AdjacentCODenver County230 kV300 MW1.7 yrs70.9
PICADILLYSubstation-AdjacentCODenver County230 kV300 MW1.7 yrs70.7
RIVERDALESubstation-AdjacentCODenver County230 kV300 MW1.7 yrs69.4
IMBODENSubstation-AdjacentCOAdams County230 kV300 MW1.7 yrs68.8
UNKNOWN203691Substation-AdjacentCOBroomfield County230 kV300 MW1.7 yrs68.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP204067 substation, Colorado. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.