TAP204025

Substation

Colorado · SAN LUIS VALLEY R E C, INC

Max voltage
115
kV

TAP204025 is an electric transmission substation in Colorado, operated by SAN LUIS VALLEY R E C, INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorSAN LUIS VALLEY R E C, INC
Coordinates37.6322, -106.0022

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#69008115 kVSAN LUIS VALLEY R E C, INC4.7 mi
#69025115 kVSAN LUIS VALLEY R E C, INC17.0 mi
#69033115 kVSAN LUIS VALLEY R E C, INC0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP204025, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP204025 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ALAMOSASubstation-AdjacentCOAlamosa County115 kV100 MW1.7 yrs61.3
SAN LUIS VALLEYSubstation-AdjacentCOAlamosa County230 kV300 MW1.7 yrs58.6
SAN LUIS VALLEY SOLAR RANCHSubstation-AdjacentCOAlamosa County115 kV100 MW1.7 yrs58.6
SARGENTSubstation-AdjacentCOAlamosa County115 kV100 MW1.7 yrs58.0
UNKNOWN203913Substation-AdjacentCORio Grande County115 kV100 MW1.7 yrs57.9
TAP204025Substation-AdjacentCOAlamosa County115 kV100 MW1.7 yrs57.6
COGENTRIX OF ALAMOSASubstation-AdjacentCOAlamosa County115 kV100 MW1.7 yrs57.5
BLM Solar DLA: Fourmile EastGreenfieldCOAlamosa County765 MW1.7 yrs56.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen