TAP203971

Substation

Colorado · WAPA-- WESTERN AREA POWER ADMINISTRATION

Max voltage
115
kV

TAP203971 is an electric transmission substation in Colorado, operated by WAPA-- WESTERN AREA POWER ADMINISTRATION. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorWAPA-- WESTERN AREA POWER ADMINISTRATION
Coordinates40.1366, -102.6812

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#68756115 kVWAPA-- WESTERN AREA POWER ADMINISTRATION3.0 mi
#68757115 kVWAPA-- WESTERN AREA POWER ADMINISTRATION7.1 mi
#72265115 kVWAPA-- WESTERN AREA POWER ADMINISTRATION0.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP203971, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP203971 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
YUMASubstation-AdjacentCOYuma County115 kV100 MW1.7 yrs63.5
UNKNOWN205860Substation-AdjacentCOYuma County115 kV100 MW1.7 yrs63.2
UNKNOWN205864Substation-AdjacentCOYuma County115 kV100 MW1.7 yrs62.0
UNKNOWN205863Substation-AdjacentCOYuma County115 kV100 MW1.7 yrs61.2
NORTH YUMASubstation-AdjacentCOYuma County230 kV300 MW1.7 yrs61.0
UNKNOWN205865Substation-AdjacentCOYuma County115 kV100 MW1.7 yrs60.8
UNKNOWN206130Substation-AdjacentCOYuma County115 kV100 MW1.7 yrs60.3
UNKNOWN205862Substation-AdjacentCOYuma County115 kV100 MW1.7 yrs60.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP203971 substation, Colorado. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.