TAP203939

Substation

Colorado · SOUTHEAST COLORADO POWER ASSN

Max voltage
115
kV

TAP203939 is an electric transmission substation in Colorado, operated by SOUTHEAST COLORADO POWER ASSN. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorSOUTHEAST COLORADO POWER ASSN
Coordinates38.0284, -102.2102

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#71739115 kVSOUTHEAST COLORADO POWER ASSN4.5 mi
#71740115 kVSOUTHEAST COLORADO POWER ASSN6.5 mi
#71775115 kVSOUTHEAST COLORADO POWER ASSN15.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP203939, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP203939 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
LAMAR HVDC TIESubstation-AdjacentCOKiowa County345 kV600 MW1.7 yrs66.1
COLORADO GREENSubstation-AdjacentCOProwers County230 kV300 MW1.7 yrs62.6
Greenfield (LAMAR HVDC TIE - UNKNOWN209699)GreenfieldKSHamilton County345 kV600 MW1.7 yrs58.8
Greenfield (LAMAR HVDC TIE - UNKNOWN209699)GreenfieldKSHamilton County345 kV600 MW1.7 yrs58.6
UNKNOWN203940Substation-AdjacentCOProwers County115 kV100 MW1.7 yrs58.4
TAP206905Substation-AdjacentCOProwers County115 kV100 MW1.7 yrs58.1
UNKNOWN203943Substation-AdjacentCOProwers County115 kV100 MW1.7 yrs57.8
TAP203938Substation-AdjacentCOProwers County115 kV100 MW1.7 yrs57.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP203939 substation, Colorado. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.