RED WILLOW

Substation

Colorado · TRI-STATE G & T ASSN, INC

Max voltage
115
kV

RED WILLOW is an electric transmission substation in Colorado, operated by TRI-STATE G & T ASSN, INC. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorTRI-STATE G & T ASSN, INC
Coordinates40.3357, -102.7373

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#68749115 kVTRI-STATE G & T ASSN, INC5.1 mi
#68750115 kVTRI-STATE G & T ASSN, INC17.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of RED WILLOW, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near RED WILLOW substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
YUMASubstation-AdjacentCOYuma County115 kV100 MW1.7 yrs63.5
UNKNOWN205860Substation-AdjacentCOYuma County115 kV100 MW1.7 yrs63.2
UNKNOWN204009Substation-AdjacentCOPhillips County115 kV100 MW1.7 yrs62.4
UNKNOWN205864Substation-AdjacentCOYuma County115 kV100 MW1.7 yrs62.0
UNKNOWN205863Substation-AdjacentCOYuma County115 kV100 MW1.7 yrs61.2
NORTH YUMASubstation-AdjacentCOYuma County230 kV300 MW1.7 yrs61.0
TAP205869Substation-AdjacentCOLogan County115 kV100 MW1.7 yrs60.4
UNKNOWN205862Substation-AdjacentCOYuma County115 kV100 MW1.7 yrs60.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.