RAMON
SubstationColorado · SAN LUIS VALLEY R E C, INC
RAMON is an electric transmission substation in Colorado, operated by SAN LUIS VALLEY R E C, INC. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #69034 | 115 kV | SAN LUIS VALLEY R E C, INC | — | 19.5 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of RAMON, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| RAMON | Substation-Adjacent | CO | Rio Grande County | 115 kV | 100 MW | 1.7 yrs | 59.6 |
| UNKNOWN203913 | Substation-Adjacent | CO | Rio Grande County | 115 kV | 100 MW | 1.7 yrs | 57.9 |
| Greenfield (RAMON - UNKNOWN203913) | Greenfield | CO | Rio Grande County | 115 kV | 100 MW | 1.7 yrs | 55.0 |
| OZ Saguache | Greenfield | CO | Saguache | — | — | 1.7 yrs | 51.4 |
| Greenfield (RAMON - UNKNOWN203913) | Greenfield | CO | Rio Grande County | 115 kV | 100 MW | 1.7 yrs | 49.2 |
| Willow Creek Floodplain | Industrial | CO | Mineral County | — | — | — | 39.5 |
| Mine Site | Former Mine | CO | Mineral County | — | — | — | 39.4 |
| Fairgrounds Property at Airport Corner | Industrial | CO | Mineral County | — | — | — | 39.4 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for RAMON substation, Colorado. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.