NUCLA

Substation

Colorado · TRI-STATE G & T ASSN, INC

Max voltage
115
kV

NUCLA is an electric transmission substation in Colorado, operated by TRI-STATE G & T ASSN, INC. It is classified as sub-transmission (115 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines4

Ownership & operation

OperatorTRI-STATE G & T ASSN, INC
Coordinates38.2381, -108.5071

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#73298115 kVTRI-STATE G & T ASSN, INC0.1 mi
#73477115 kVTRI-STATE G & T ASSN, INC0.1 mi
#73478115 kVTRI-STATE G & T ASSN, INC0.1 mi
#73479115 kVTRI-STATE G & T ASSN, INC0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of NUCLA, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near NUCLA substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (MONTROSE - HESPERUS)GreenfieldCOMontrose County345 kV600 MW1.7 yrs59.9
UNKNOWN203905Substation-AdjacentCOSan Miguel County115 kV100 MW1.7 yrs58.1
UNKNOWN201518Substation-AdjacentCOSan Miguel County115 kV100 MW1.7 yrs56.5
Greenfield (CURECANTI - LOST CANYON)GreenfieldCOSan Miguel County230 kV300 MW1.7 yrs55.4
Greenfield (MONTROSE - HESPERUS)GreenfieldCOSan Miguel County345 kV600 MW1.7 yrs55.4
Greenfield (MONTROSE - HESPERUS)GreenfieldCOSan Miguel County345 kV600 MW1.7 yrs55.2
Greenfield (UNKNOWN201518 - MONTROSE)GreenfieldCOMontrose County115 kV100 MW1.7 yrs55.2
Greenfield (MONTROSE - HESPERUS)GreenfieldCOSan Miguel County345 kV600 MW1.7 yrs55.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for NUCLA substation, Colorado. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.