NORTH PARK is an electric transmission substation in Colorado, operated by WAPA-- WESTERN AREA POWER ADMINISTRATION. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorWAPA-- WESTERN AREA POWER ADMINISTRATION
Coordinates40.8122, -106.2907

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#68436230 kVWAPA-- WESTERN AREA POWER ADMINISTRATION96.2 mi
#68439230 kVWAPA-- WESTERN AREA POWER ADMINISTRATION61.3 mi
#72278230 kVWAPA-- WESTERN AREA POWER ADMINISTRATION84.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of NORTH PARK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near NORTH PARK substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
NORTH PARKSubstation-AdjacentCOJackson County230 kV300 MW1.7 yrs57.1
Greenfield (CRAIG - AULT)GreenfieldCORoutt County345 kV600 MW1.7 yrs56.7
Greenfield (CRAIG - AULT)GreenfieldCOJackson County345 kV600 MW1.7 yrs56.5
Greenfield (CRAIG - AULT)GreenfieldCOJackson County345 kV600 MW1.7 yrs56.2
Greenfield (CRAIG - AULT)GreenfieldCOJackson County345 kV600 MW1.7 yrs55.9
Greenfield (CRAIG - AULT)GreenfieldCOJackson County345 kV600 MW1.7 yrs55.0
Greenfield (CRAIG - AULT)GreenfieldCOJackson County345 kV600 MW1.7 yrs54.7
Greenfield (CRAIG - AULT)GreenfieldCOJackson County345 kV600 MW1.7 yrs54.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for NORTH PARK substation, Colorado. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.