NORTH PARK
SubstationColorado · WAPA-- WESTERN AREA POWER ADMINISTRATION
NORTH PARK is an electric transmission substation in Colorado, operated by WAPA-- WESTERN AREA POWER ADMINISTRATION. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #68436 | 230 kV | WAPA-- WESTERN AREA POWER ADMINISTRATION | — | 96.2 mi |
| #68439 | 230 kV | WAPA-- WESTERN AREA POWER ADMINISTRATION | — | 61.3 mi |
| #72278 | 230 kV | WAPA-- WESTERN AREA POWER ADMINISTRATION | — | 84.0 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of NORTH PARK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| NORTH PARK | Substation-Adjacent | CO | Jackson County | 230 kV | 300 MW | 1.7 yrs | 57.1 |
| Greenfield (CRAIG - AULT) | Greenfield | CO | Routt County | 345 kV | 600 MW | 1.7 yrs | 56.7 |
| Greenfield (CRAIG - AULT) | Greenfield | CO | Jackson County | 345 kV | 600 MW | 1.7 yrs | 56.5 |
| Greenfield (CRAIG - AULT) | Greenfield | CO | Jackson County | 345 kV | 600 MW | 1.7 yrs | 56.2 |
| Greenfield (CRAIG - AULT) | Greenfield | CO | Jackson County | 345 kV | 600 MW | 1.7 yrs | 55.9 |
| Greenfield (CRAIG - AULT) | Greenfield | CO | Jackson County | 345 kV | 600 MW | 1.7 yrs | 55.0 |
| Greenfield (CRAIG - AULT) | Greenfield | CO | Jackson County | 345 kV | 600 MW | 1.7 yrs | 54.7 |
| Greenfield (CRAIG - AULT) | Greenfield | CO | Jackson County | 345 kV | 600 MW | 1.7 yrs | 54.7 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for NORTH PARK substation, Colorado. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.