MEEKER

Substation

Colorado · TRI-STATE G & T ASSN, INC

Max voltage
345
kV

MEEKER is an electric transmission substation in Colorado, operated by TRI-STATE G & T ASSN, INC. It is classified as high-voltage (345 kv) and connects 7 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage138 kV
Voltage classHigh-voltage (345 kV)
Connected lines7

Ownership & operation

OperatorTRI-STATE G & T ASSN, INC
Coordinates40.0074, -107.9804

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#67309345 kVTRI-STATE G & T ASSN, INC26.9 mi
#67310345 kVTRI-STATE G & T ASSN, INC39.0 mi
#67308345 kVTRI-STATE G & T ASSN, INC43.0 mi
#68985230 kVTRI-STATE G & T ASSN, INC16.2 mi
#68697138 kVTRI-STATE G & T ASSN, INC41.5 mi
#68704138 kVTRI-STATE G & T ASSN, INC26.0 mi
#68707138 kVTRI-STATE G & T ASSN, INC38.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MEEKER, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MEEKER substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MCBRYDESubstation-AdjacentCORio Blanco County345 kV600 MW1.7 yrs63.4
MEEKERSubstation-AdjacentCORio Blanco County345 kV600 MW1.7 yrs62.1
UNKNOWN203887Substation-AdjacentCORio Blanco County230 kV300 MW1.7 yrs61.2
UNKNOWN203881Substation-AdjacentCORio Blanco County230 kV300 MW1.7 yrs60.4
Greenfield (CRAIG - TAP203975)GreenfieldCOGarfield County345 kV600 MW1.7 yrs59.7
UNKNOWN209551Substation-AdjacentCORio Blanco County230 kV300 MW1.7 yrs58.6
Greenfield (CRAIG - MEEKER)GreenfieldCOMoffat County345 kV600 MW1.7 yrs58.2
UNKNOWN201521Substation-AdjacentCOGarfield County138 kV100 MW1.7 yrs58.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for MEEKER substation, Colorado. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.