MANCOS

Substation

Colorado · TRI-STATE G & T ASSN, INC

Max voltage
115
kV

MANCOS is an electric transmission substation in Colorado, operated by TRI-STATE G & T ASSN, INC. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorTRI-STATE G & T ASSN, INC
Coordinates37.3466, -108.2990

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#68795115 kVTRI-STATE G & T ASSN, INC2.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MANCOS, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MANCOS substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
HESPERUSSubstation-AdjacentCOLa Plata County345 kV600 MW1.7 yrs65.9
LOST CANYONSubstation-AdjacentCOMontezuma County230 kV300 MW3.5 yrs65.1
UNKNOWN204023Substation-AdjacentCOLa Plata County115 kV100 MW1.7 yrs60.0
MANCOSSubstation-AdjacentCOMontezuma County115 kV100 MW1.7 yrs58.9
UNKNOWN208050Substation-AdjacentCOMontezuma County115 kV100 MW1.7 yrs58.6
UNKNOWN201499Substation-AdjacentCOMontezuma County115 kV100 MW1.7 yrs58.3
UNKNOWN208065Substation-AdjacentCOMontezuma County138 kV100 MW1.7 yrs58.2
TAP204022Substation-AdjacentCOLa Plata County115 kV100 MW1.7 yrs57.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for MANCOS substation, Colorado. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.