LOVELAND WEST TAP

Substation

Colorado · PUBLIC SERVICE CO OF COLORADO

Max voltage
115
kV

LOVELAND WEST TAP is an electric transmission substation in Colorado, operated by PUBLIC SERVICE CO OF COLORADO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorPUBLIC SERVICE CO OF COLORADO
Coordinates40.3820, -105.1296

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#72209115 kVPUBLIC SERVICE CO OF COLORADO4.0 mi
#72210115 kVPUBLIC SERVICE CO OF COLORADO4.7 mi
#72211115 kVPUBLIC SERVICE CO OF COLORADO2.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of LOVELAND WEST TAP, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near LOVELAND WEST TAP substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN201488Substation-AdjacentCOBroomfield County230 kV300 MW1.7 yrs70.4
ValmontBrownfieldCOBroomfield192 MW69.7
FORDHAMSubstation-AdjacentCOBroomfield County230 kV300 MW1.7 yrs68.4
UNKNOWN203691Substation-AdjacentCOBroomfield County230 kV300 MW1.7 yrs68.4
GUNBARRELSubstation-AdjacentCOBoulder County230 kV300 MW1.7 yrs67.8
AULTSubstation-AdjacentCOWeld County345 kV600 MW1.7 yrs67.5
HARMONYSubstation-AdjacentCOLarimer County230 kV300 MW1.7 yrs67.4
Boulder Cowdery Meadows Solar ArrayBrownfieldCOBoulder1 MW67.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.