JOES

Substation

Colorado · TRI-STATE G & T ASSN, INC

Max voltage
115
kV

JOES is an electric transmission substation in Colorado, operated by TRI-STATE G & T ASSN, INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorTRI-STATE G & T ASSN, INC
Coordinates39.6554, -102.7076

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#68765115 kVTRI-STATE G & T ASSN, INC14.1 mi
#68766115 kVTRI-STATE G & T ASSN, INC7.1 mi
#71828115 kVTRI-STATE G & T ASSN, INC0.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of JOES, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near JOES substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
LANDSMAN CREEKSubstation-AdjacentCOKit Carson County230 kV300 MW1.7 yrs64.7
UNKNOWN205864Substation-AdjacentCOYuma County115 kV100 MW1.7 yrs62.0
JOESSubstation-AdjacentCOKit Carson County115 kV100 MW1.7 yrs61.6
UNKNOWN205865Substation-AdjacentCOYuma County115 kV100 MW1.7 yrs60.8
UNKNOWN206130Substation-AdjacentCOYuma County115 kV100 MW1.7 yrs60.3
LIBERTYSubstation-AdjacentCOKit Carson County115 kV100 MW1.7 yrs60.2
UNKNOWN208113Substation-AdjacentCOKit Carson County115 kV100 MW1.7 yrs60.2
UNKNOWN205862Substation-AdjacentCOYuma County115 kV100 MW1.7 yrs60.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.