HOYT

Substation

Colorado · WAPA-- WESTERN AREA POWER ADMINISTRATION

Max voltage
115
kV

HOYT is an electric transmission substation in Colorado, operated by WAPA-- WESTERN AREA POWER ADMINISTRATION. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorWAPA-- WESTERN AREA POWER ADMINISTRATION
Coordinates40.0160, -104.0947

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#68906115 kVWAPA-- WESTERN AREA POWER ADMINISTRATION33.7 mi
#69127115 kVWAPA-- WESTERN AREA POWER ADMINISTRATION16.0 mi
#72255115 kVWAPA-- WESTERN AREA POWER ADMINISTRATION7.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of HOYT, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near HOYT substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BRICK CENTERSubstation-AdjacentCOArapahoe County230 kV300 MW1.7 yrs66.7
MISSLE SITESubstation-AdjacentCOArapahoe County345 kV600 MW1.7 yrs66.2
TAP206216Substation-AdjacentCOMorgan County230 kV300 MW1.7 yrs66.1
TAP206215Substation-AdjacentCOMorgan County230 kV300 MW1.7 yrs65.9
UNKNOWN204003Substation-AdjacentCOArapahoe County115 kV100 MW1.7 yrs64.8
TAP205856Substation-AdjacentCOMorgan County115 kV100 MW1.7 yrs62.6
Greenfield (MISSLE SITE - PAWNEE)GreenfieldCOMorgan County345 kV600 MW1.7 yrs62.5
UNKNOWN205150Substation-AdjacentCOMorgan County115 kV100 MW1.7 yrs62.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for HOYT substation, Colorado. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.