HOPKINS
SubstationColorado · PUBLIC SERVICE CO OF COLORADO
HOPKINS is an electric transmission substation in Colorado, operated by PUBLIC SERVICE CO OF COLORADO. It is classified as high-voltage (230 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #68714 | 230 kV | PUBLIC SERVICE CO OF COLORADO | — | 59.6 mi |
| #68734 | 230 kV | PUBLIC SERVICE CO OF COLORADO | — | 26.7 mi |
| #68732 | 115 kV | PUBLIC SERVICE CO OF COLORADO | — | 11.0 mi |
| #68733 | 115 kV | PUBLIC SERVICE CO OF COLORADO | — | 7.3 mi |
| #68735 | 115 kV | PUBLIC SERVICE CO OF COLORADO | — | 5.9 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of HOPKINS, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| COOLEY MESA | Substation-Adjacent | CO | Eagle County | 230 kV | 300 MW | 1.7 yrs | 63.6 |
| SHOSHONE | Substation-Adjacent | CO | Eagle County | 115 kV | 100 MW | 1.7 yrs | 59.9 |
| UNKNOWN209707 | Substation-Adjacent | CO | Eagle County | 115 kV | 100 MW | 1.7 yrs | 59.4 |
| Greenfield (HOPKINS - RIFLE PSCO) | Greenfield | CO | Garfield County | 230 kV | 300 MW | 1.7 yrs | 55.7 |
| Greenfield (MALTA - HOPKINS) | Greenfield | CO | Eagle County | 230 kV | 300 MW | 1.7 yrs | 55.6 |
| GIS | Substation-Adjacent | CO | Pitkin County | 115 kV | 100 MW | 1.7 yrs | 55.4 |
| HOPKINS | Substation-Adjacent | CO | Pitkin County | 230 kV | 300 MW | 1.7 yrs | 54.9 |
| BASALT | Substation-Adjacent | CO | Pitkin County | 230 kV | 300 MW | 1.7 yrs | 54.8 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for HOPKINS substation, Colorado. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.