HENRY LAKE

Substation

Colorado · PUBLIC SERVICE CO OF COLORADO

Max voltage
230
kV

HENRY LAKE is an electric transmission substation in Colorado, operated by PUBLIC SERVICE CO OF COLORADO. It is classified as high-voltage (230 kv) and connects 6 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines6

Ownership & operation

OperatorPUBLIC SERVICE CO OF COLORADO
Co-ownerTRI-STATE G & T ASSN, INC
Co-ownerUNITED POWER, INC
Coordinates40.0164, -104.7550

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#68905230 kVTRI-STATE G & T ASSN, INC69.1 mi
#69095230 kVPUBLIC SERVICE CO OF COLORADO25.4 mi
#69096230 kVUNITED POWER, INC7.0 mi
#69125230 kVTRI-STATE G & T ASSN, INC3.5 mi
#69101115 kVUNITED POWER, INC3.5 mi
#78990115 kVUNITED POWER, INC6.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of HENRY LAKE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near HENRY LAKE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CHEROKEESubstation-AdjacentCODenver County230 kV300 MW1.7 yrs75.1
CHAMBERSSubstation-AdjacentCODenver County230 kV300 MW1.7 yrs72.5
LACOMBESubstation-AdjacentCODenver County230 kV300 MW1.7 yrs72.0
JEWELLSubstation-AdjacentCODenver County230 kV300 MW1.7 yrs71.9
ELATISubstation-AdjacentCODenver County230 kV300 MW1.7 yrs71.8
SPRUCESubstation-AdjacentCODenver County230 kV300 MW1.7 yrs71.7
DAKOTASubstation-AdjacentCODenver County230 kV300 MW1.7 yrs71.5
MONROESubstation-AdjacentCODenver County230 kV300 MW1.7 yrs71.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for HENRY LAKE substation, Colorado. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.