GREELEY

Substation

Colorado · PUBLIC SERVICE CO OF COLORADO

Max voltage
115
kV

GREELEY is an electric transmission substation in Colorado, operated by PUBLIC SERVICE CO OF COLORADO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorPUBLIC SERVICE CO OF COLORADO
Coordinates40.4224, -104.7173

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#72249115 kVPUBLIC SERVICE CO OF COLORADO5.6 mi
#72250115 kVPUBLIC SERVICE CO OF COLORADO3.9 mi
#72252115 kVPUBLIC SERVICE CO OF COLORADO7.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of GREELEY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near GREELEY substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN203691Substation-AdjacentCOBroomfield County230 kV300 MW1.7 yrs68.4
AULTSubstation-AdjacentCOWeld County345 kV600 MW1.7 yrs67.5
HARMONYSubstation-AdjacentCOLarimer County230 kV300 MW1.7 yrs67.4
PORTNERSubstation-AdjacentCOLarimer County230 kV300 MW1.7 yrs66.9
FORT ST VRAINSubstation-AdjacentCOBroomfield County230 kV300 MW1.7 yrs66.4
CIPRESSubstation-AdjacentCOBroomfield County230 kV300 MW1.7 yrs66.4
KEENESBURGSubstation-AdjacentCOAdams County230 kV300 MW1.7 yrs66.0
SPINDLESubstation-AdjacentCOBroomfield County230 kV300 MW1.7 yrs65.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen