GARNET MESA

Substation

Colorado · DELTA MONTROSE ELECTRIC ASSN

Max voltage
115
kV

GARNET MESA is an electric transmission substation in Colorado, operated by DELTA MONTROSE ELECTRIC ASSN. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorDELTA MONTROSE ELECTRIC ASSN
Coordinates38.7258, -108.0099

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#68784115 kVDELTA MONTROSE ELECTRIC ASSN6.0 mi
#72369115 kVDELTA MONTROSE ELECTRIC ASSN2.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of GARNET MESA, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near GARNET MESA substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MONTROSESubstation-AdjacentCOMontrose County345 kV600 MW1.7 yrs66.4
NORTH MESASubstation-AdjacentCOMontrose County115 kV100 MW1.7 yrs62.7
TAP203988Substation-AdjacentCOMontrose County115 kV100 MW1.7 yrs62.5
UNKNOWN205920Substation-AdjacentCODelta County115 kV100 MW1.7 yrs62.0
Greenfield (GRAND JUNCTION - MONTROSE)GreenfieldCOMontrose County345 kV600 MW1.7 yrs62.0
Greenfield (GRAND JUNCTION - MONTROSE)GreenfieldCOMontrose County345 kV600 MW1.7 yrs61.5
UNKNOWN207591Substation-AdjacentCODelta County115 kV100 MW1.7 yrs61.4
UNKNOWN203749Substation-AdjacentCODelta County115 kV100 MW1.7 yrs61.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for GARNET MESA substation, Colorado. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.