FULLER

Substation

Colorado · CITY OF COLORADO SPRINGS - (CO)

Max voltage
230
kV

FULLER is an electric transmission substation in Colorado, operated by CITY OF COLORADO SPRINGS - (CO). It is classified as high-voltage (230 kv) and connects 6 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines6

Ownership & operation

OperatorCITY OF COLORADO SPRINGS - (CO)
Co-ownerPUBLIC SERVICE CO OF COLORADO
Coordinates38.9367, -104.6299

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#67319230 kVPUBLIC SERVICE CO OF COLORADO44.4 mi
#67321230 kVPUBLIC SERVICE CO OF COLORADO28.8 mi
#72151230 kVCITY OF COLORADO SPRINGS - (CO)8.6 mi
#72170230 kVCITY OF COLORADO SPRINGS - (CO)7.6 mi
#71797115 kVCITY OF COLORADO SPRINGS - (CO)5.5 mi
#71798115 kVCITY OF COLORADO SPRINGS - (CO)2.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of FULLER, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near FULLER substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
South Plant (CO)BrownfieldCOEl Paso257 MW74.4
MIDWAYSubstation-AdjacentCOEl Paso County345 kV600 MW1.7 yrs70.9
UNKNOWN202239Substation-AdjacentCOEl Paso County230 kV300 MW1.7 yrs70.8
UNKNOWN202845Substation-AdjacentCOEl Paso County230 kV300 MW1.7 yrs70.8
FRONT RANGE POWER PLANTSubstation-AdjacentCOEl Paso County230 kV300 MW1.7 yrs69.6
TAP209761Substation-AdjacentCOEl Paso County230 kV300 MW1.7 yrs69.6
UNKNOWN202739Substation-AdjacentCOEl Paso County230 kV300 MW1.7 yrs69.4
MARTIN DRAKESubstation-AdjacentCOEl Paso County115 kV100 MW1.7 yrs69.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for FULLER substation, Colorado. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.