FOWLER

Substation

Colorado · BLACK HILLS/COLORADO ELEC.UTIL

Max voltage
115
kV

FOWLER is an electric transmission substation in Colorado, operated by BLACK HILLS/COLORADO ELEC.UTIL. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorBLACK HILLS/COLORADO ELEC.UTIL
Coordinates38.1312, -104.0202

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#78787115 kVBLACK HILLS/COLORADO ELEC.UTIL8.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of FOWLER, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near FOWLER substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BOONESubstation-AdjacentCOPueblo County230 kV300 MW1.7 yrs64.7
UNKNOWN208091Substation-AdjacentCOPueblo County115 kV100 MW1.7 yrs63.5
UNKNOWN208089Substation-AdjacentCOPueblo County115 kV100 MW1.7 yrs63.1
UNKNOWN208088Substation-AdjacentCOPueblo County138 kV100 MW1.7 yrs62.8
UNKNOWN208092Substation-AdjacentCOPueblo County115 kV100 MW1.7 yrs62.1
TAP208093Substation-AdjacentCOPueblo County115 kV100 MW1.7 yrs62.0
UNKNOWN208095Substation-AdjacentCOPueblo County115 kV100 MW1.7 yrs61.9
TAP208085Substation-AdjacentCOPueblo County138 kV100 MW1.7 yrs61.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for FOWLER substation, Colorado. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.