FORDHAM

Substation

Colorado · PLATTE RIVER POWER AUTHORITY

Max voltage
230
kV

FORDHAM is an electric transmission substation in Colorado, operated by PLATTE RIVER POWER AUTHORITY. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorPLATTE RIVER POWER AUTHORITY
Co-ownerWAPA-- WESTERN AREA POWER ADMINISTRATION
Coordinates40.1428, -105.1394

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#68923230 kVPLATTE RIVER POWER AUTHORITY21.7 mi
#72340115 kVWAPA-- WESTERN AREA POWER ADMINISTRATION2.1 mi
#72343115 kVWAPA-- WESTERN AREA POWER ADMINISTRATION2.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of FORDHAM, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near FORDHAM substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CHEROKEESubstation-AdjacentCODenver County230 kV300 MW1.7 yrs75.1
CHAMBERSSubstation-AdjacentCODenver County230 kV300 MW1.7 yrs72.5
LACOMBESubstation-AdjacentCODenver County230 kV300 MW1.7 yrs72.0
REUNIONSubstation-AdjacentCODenver County230 kV300 MW1.7 yrs70.9
UNKNOWN201488Substation-AdjacentCOBroomfield County230 kV300 MW1.7 yrs70.4
ARVADASubstation-AdjacentCODenver County230 kV300 MW1.7 yrs70.1
RUSSELLSubstation-AdjacentCODenver County230 kV300 MW1.7 yrs70.1
ValmontBrownfieldCOBroomfield192 MW69.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for FORDHAM substation, Colorado. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.