ENNIS

Substation

Colorado · WAPA-- WESTERN AREA POWER ADMINISTRATION

Max voltage
115
kV

ENNIS is an electric transmission substation in Colorado, operated by WAPA-- WESTERN AREA POWER ADMINISTRATION. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorWAPA-- WESTERN AREA POWER ADMINISTRATION
Coordinates40.1814, -104.5084

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#69103115 kVWAPA-- WESTERN AREA POWER ADMINISTRATION11.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of ENNIS, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near ENNIS substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
REUNIONSubstation-AdjacentCODenver County230 kV300 MW1.7 yrs70.9
IMBODENSubstation-AdjacentCOAdams County230 kV300 MW1.7 yrs68.8
UNKNOWN203691Substation-AdjacentCOBroomfield County230 kV300 MW1.7 yrs68.4
GREEN VALLEYSubstation-AdjacentCOAdams County230 kV300 MW1.7 yrs66.8
CIPRESSubstation-AdjacentCOBroomfield County230 kV300 MW1.7 yrs66.4
FORT ST VRAINSubstation-AdjacentCOBroomfield County230 kV300 MW1.7 yrs66.4
HENRY LAKESubstation-AdjacentCOBroomfield County230 kV300 MW1.7 yrs66.4
UNKNOWN203028Substation-AdjacentCODenver County115 kV100 MW1.7 yrs66.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen