CEDAR CREEK II

Substation

Colorado · PUBLIC SERVICE CO OF COLORADO

Max voltage
230
kV

CEDAR CREEK II is an electric transmission substation in Colorado, operated by PUBLIC SERVICE CO OF COLORADO. It is classified as high-voltage (230 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines1

Ownership & operation

OperatorPUBLIC SERVICE CO OF COLORADO
Coordinates40.9481, -103.7811

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#73239230 kVPUBLIC SERVICE CO OF COLORADO0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CEDAR CREEK II, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CEDAR CREEK II substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CEDAR CREEK IISubstation-AdjacentNEKimball County230 kV300 MW1.7 yrs64.9
CEDAR CREEK WINDSubstation-AdjacentNEKimball County230 kV300 MW1.7 yrs64.1
UNKNOWN202730Substation-AdjacentNEKimball County161 kV100 MW1.7 yrs63.9
UNKNOWN202601Substation-AdjacentCOWeld County230 kV300 MW1.7 yrs63.9
UNKNOWN204230Substation-AdjacentNEKimball County138 kV100 MW1.7 yrs63.1
UNKNOWN205892Substation-AdjacentNEKimball County115 kV100 MW3.5 yrs62.3
UNKNOWN208154Substation-AdjacentCOMorgan County138 kV100 MW1.7 yrs60.8
TAP208153Substation-AdjacentCOMorgan County138 kV100 MW1.7 yrs60.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.