BOONE

Substation

Colorado · BLACK HILLS POWER, INC.

Max voltage
230
kV

BOONE is an electric transmission substation in Colorado, operated by BLACK HILLS POWER, INC.. It is classified as high-voltage (230 kv) and connects 6 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines6

Ownership & operation

OperatorBLACK HILLS POWER, INC.
Co-ownerPUBLIC SERVICE CO OF COLORADO
Co-ownerTRI-STATE G & T ASSN, INC
Coordinates38.2558, -104.2240

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#68857230 kVPUBLIC SERVICE CO OF COLORADO26.7 mi
#68860230 kVTRI-STATE G & T ASSN, INC43.5 mi
#68865230 kVTRI-STATE G & T ASSN, INC98.7 mi
#68861115 kVBLACK HILLS POWER, INC.45.4 mi
#68862115 kVBLACK HILLS POWER, INC.11.2 mi
#68864115 kVTRI-STATE G & T ASSN, INC45.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BOONE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BOONE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
COMANCHESubstation-AdjacentCOPueblo County345 kV600 MW1.7 yrs73.7
PUEBLOSubstation-AdjacentCOPueblo County230 kV300 MW1.7 yrs69.1
Pueblo Airport Generating StationBrownfieldCOPueblo100 MW66.5
PUEBLO AIRPORT GENERATING STATIONSubstation-AdjacentCOPueblo County115 kV100 MW1.7 yrs65.9
Greenfield (DANIELS PARK - COMANCHE)GreenfieldCOEl Paso County345 kV600 MW1.7 yrs65.8
BOONESubstation-AdjacentCOPueblo County230 kV300 MW1.7 yrs64.7
UNKNOWN208082Substation-AdjacentCOPueblo County138 kV100 MW1.7 yrs63.9
Greenfield (DANIELS PARK - COMANCHE)GreenfieldCOEl Paso County345 kV600 MW1.7 yrs63.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BOONE substation, Colorado. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.