BEAVER CREEK

Substation

Colorado · HOLY CROSS ELECTRIC ASSN, INC

Max voltage
115
kV

BEAVER CREEK is an electric transmission substation in Colorado, operated by HOLY CROSS ELECTRIC ASSN, INC. It is classified as sub-transmission (115 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines4

Ownership & operation

OperatorHOLY CROSS ELECTRIC ASSN, INC
Coordinates39.6437, -106.5371

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#72355115 kVHOLY CROSS ELECTRIC ASSN, INC10.8 mi
#72356115 kVHOLY CROSS ELECTRIC ASSN, INC9.8 mi
#72357115 kVHOLY CROSS ELECTRIC ASSN, INC11.1 mi
#72359115 kVHOLY CROSS ELECTRIC ASSN, INC5.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BEAVER CREEK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BEAVER CREEK substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
COOLEY MESASubstation-AdjacentCOEagle County230 kV300 MW1.7 yrs63.6
CLIMAXSubstation-AdjacentCOLake County115 kV100 MW1.7 yrs60.0
UNKNOWN205913Substation-AdjacentCOLake County115 kV100 MW1.7 yrs59.4
UNKNOWN209707Substation-AdjacentCOEagle County115 kV100 MW1.7 yrs59.4
BLUE RIVERSubstation-AdjacentCOGrand County230 kV300 MW1.7 yrs58.9
LEADVILLESubstation-AdjacentCOLake County115 kV100 MW1.7 yrs58.6
AVONSubstation-AdjacentCOEagle County115 kV100 MW1.7 yrs58.2
MAYFLOWERSubstation-AdjacentCOSummit County115 kV100 MW1.7 yrs58.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BEAVER CREEK substation, Colorado. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.