BEARS EARS

Substation

Colorado · TRI-STATE G & T ASSN, INC

Max voltage
345
kV

BEARS EARS is an electric transmission substation in Colorado, operated by TRI-STATE G & T ASSN, INC. It is classified as high-voltage (345 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage230 kV
Voltage classHigh-voltage (345 kV)
Connected lines3

Ownership & operation

OperatorTRI-STATE G & T ASSN, INC
Coordinates40.4803, -107.5936

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#67305345 kVTRI-STATE G & T ASSN, INC100.9 mi
#67306345 kVTRI-STATE G & T ASSN, INC0.6 mi
#67307230 kVTRI-STATE G & T ASSN, INC0.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BEARS EARS, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BEARS EARS substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BEARS EARSSubstation-AdjacentCORoutt County345 kV600 MW1.7 yrs66.1
CRAIGSubstation-AdjacentCORoutt County345 kV600 MW1.7 yrs62.9
Greenfield (CRAIG - AULT)GreenfieldCORoutt County345 kV600 MW1.7 yrs59.1
Greenfield (BONANZA - BEARS EARS)GreenfieldCOMoffat County345 kV600 MW1.7 yrs58.7
Greenfield (BONANZA - BEARS EARS)GreenfieldCOMoffat County345 kV600 MW1.7 yrs58.4
Greenfield (CRAIG - MEEKER)GreenfieldCOMoffat County345 kV600 MW1.7 yrs58.2
Greenfield (CRAIG - MEEKER)GreenfieldCOMoffat County345 kV600 MW1.7 yrs57.8
UNKNOWN203872Substation-AdjacentCORio Blanco County138 kV100 MW1.7 yrs57.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.